Houston Tub To Shower Hall Bath Remodel ~ Everhart Construction skip to Main Content

Everhart construction

Call Us Today!

Tub To Shower Hall Bath Remodel

Project Description

This luxurious Houston Bathroom Remodel to this 1960’s home. We removed the old tub and replaced it with full-size walk-in shower with bench and rainfall showerhead. Upgraded the tile floors to give it the same look all the way through, and a new sink and vanity.

Duration

3 1/2 Weeks

Cost

28K

Designed By

Lee Mash

After

Back To Top