skip to Main Content

Hall Bath Makeover

Project Description

This was a simple hall bath remodel in which we kept the existing tub, vanity cabinet and commode. We enlarged the existing shower considerably, install new shower valve and drain lines. We install new granite counter top, new shower door unit, new sink and faucet. We install all porcelain tile on the bathroom floor, tub and shower walls. we also removed the wall paper and textured and painted the walls.

Duration

3 Weeks

Cost

12000

Designed By

Lee Mash

Before
After
Back To Top