Testimonials

"Everhart Construction was wonderful to work with on our home remodel. Lee Mash brought a wealth of knowledge and the entire crew was very professional. They stayed on schedule, almost to the day! I would highly recommend working with Everhart for any remodel project."

Beth

"After checking with several companies for my bathroom remodel, I choose to go with Everhart Construction. They did not pressure me with the sale and were open to my ideas. They were quick to get things started and paid great attention to the details that I wanted. The crew that came into my home to do the work were great to work with, made sure they protected every part of my house all the way to the bathroom daily and worked with me to ensure everything was perfect. I am very excited with the end results and would recommend them to friends."

Laura

Kitchen Gallery

Major Kitchen Remodel

BeforeEverhart Construction
After
View Gallery

Project Description:

This kitchen remodeling project was a complete remodel. We gutted the existing pantry, wet bar, raised the ceilings from 8 foot to 10 foot. Removed and created new entrances. Completed with custom cabinetry, granite counter tops, granite backsplash. Screaded hardwood floors.

Duration: 90 Days

Cost: $120,000.00

Designed By: Lee Mash

Kitchen Details

BeforeEverhart Construction
After
View Gallery

Project Description:

Duration: 90 Days

Cost: $ 120,000.00

Designed By: Lee Mash

1970's Kitchen Remodel

Before
After
View Gallery

Project Description:

This was a pretty typical late 1970's kitchen and breakfast room that was clearly ready for a makeover. We replaced the window seat with a triple door unit to allow access to the side yard and also to bring more natural light into the space. We install Bertch Legacy Cabinetry with Granite counter tops, tile back splash and a Cherry Wood floor.

Duration: 5 Weeks

Cost: $45,000.00

Designed By: Lee Mash

Kitchen Enlargement

Before
After
View Gallery

Project Description:

This kitchen was part of a room addition and kitchen remodel combination. We opened up the existing breakfast room to access the new home office and a new game room was thru the office. We installed multi-leveled Bertch Cabinetry to the 9 foot ceiling with Granite Counters, stone back splash and Stainless Appliances. We also install a Laminate floor to match the rest of the home

Duration: 6 Weeks

Cost: $71,000.00

Designed By: Lee Mash

Low Budget Kitchen Makeover

Before
After
View Gallery

Project Description:

This was a very simple and inexpensive remodel. The home owner wanted a more open kitchen so we removed a few upper cabinets and a fir down, re stained the cabinets and added some recessed can lights.

Duration: 2 Weeks

Cost: $7,500.00

Designed By: Lee Mash

Breakfast Room Extension

Before
After
View Gallery

Project Description:

This kitchen and breakfast room remodel was part of a whole house rebuild we did. We extended the breakfast room by 6 feet and installed all new electrical, plumbing, duct work, sheet rock and paint. We also installed custom cabinetry, granite counter tops, porcelain tile floor and back splash. We also added a much larger pantry and all new doors an windows.

Duration: 90 Days

Cost: $65,000.00

Designed By: Clay Everitt

Simple Kitchen Remodel

BeforeEverhart Construction
After
View Gallery

Project Description:

This kitchen had been flooded by 2" of water. We were able to save the upper cabinets and match the lower cabinets saving the home owner a considerable amount of money. We install new lower cabinets, Granite counter tops, Tile back splash and all new flooring. We also replaced the doors, base and trim and did a complete paint job.

Duration: 6 Weeks

Cost: $28,000.00

Designed By: Clay Everitt

1950's Kitchen Remodel

BeforeEverhart Construction
After
View Gallery

Project Description:

This 1950's home had a tiny kitchen with a separate breakfast room and the owners ( Who had lived in the home for 60 years ) wanted to make one large kitchen more suited to their family and now grand kids.

Duration: 6 Weeks

Cost: $38,000.00

Designed By: Clay Everitt

Traditional Kitchen, Breakfast, Laundry & Powder Room Remodel

BeforeEverhart Construction
After
View Gallery

Project Description:

Duration: 60 Days

Cost: $ 77,000.00

Designed By: Lee Mash

Shaker Kitchen Remodel

BeforeEverhart Construction
After
View Gallery

Project Description:

Duration: 3 Weeks

Cost: $ 16,500.00

Designed By: Everhart Design Team

Major Kitchen Transformation

BeforeEverhart Construction
After
View Gallery

Project Description:

Duration: 90 Days

Cost: $ 68,000.00

Designed By: Lee Mash


Experience You Can Trust

For more than 25 years, we've worked hard to earn our reputation as a trusted Remodeling Contractor in Houston specializing in custom room additions, home remodeling, bathroom remodeling, kitchen remodeling and outdoor projects.