Kitchen Remodel

Project 1

1Project Description:

This kitchen remodeling project was a complete remodel. We gutted the existing pantry, wet bar, raised the ceilings from 8 foot to 10 foot. Removed and created new entrances. Completed with custom cabinetry, granite counter tops, granite backsplash. Screaded hardwood floors.

Project Cost: $ 120,000.00

Project Duration: 90 days

Project 2

Project Description:

This 1950's home had a tiny kitchen with a separate breakfast room and the owners ( Who had lived in the home for 60 years ) wanted to make one large kitchen more suited to their family and now grand kids.

Project Cost: $38,000.00

Project Duration: 6 Weeks

Project 3

Project Description:

This kitchen had been flooded by 2" of water. We were able to save the upper cabinets and match the lower cabinets saving the home owner a considerable amount of money. We install new lower cabinets, Granite counter tops, Tile back splash and all new flooring. We also replaced the doors, base and trim and did a complete paint job.

Project Cost: $28,000.00

Project Duration: 6 Weeks

Project 4

Project Description:

This was a very simple and inexpensive remodel. The home owner wanted a more open kitchen so we removed a few upper cabinets and a fir down, re stained the cabinets and added some recessed can lights.

Project Cost: $7500.00

Project Duration: 2 Weeks

Project 5

Project Description:

This kitchen and breakfast room remodel was part of a whole house rebuild we did. We extended the breakfast room by 6 feet and installed all new electrical, plumbing, duct work, sheet rock and paint. We also installed custom cabinetry, granite counter tops, porcelain tile floor and back splash. We also added a much larger pantry and all new doors an windows.

Project Cost: $65,000.00

Project Duration: 90 days

Project 8

Project Description:

This was a pretty typical late 1970's kitchen and breakfast room that was clearly ready for a makeover. We replaced the window seat with a triple door unit to allow access to the side yard and also to bring more natural light into the space. We install Bertch Legacy Cabinetry with Granite counter tops, tile back splash and a Cherry Wood floor.

Project Cost: $45,000.00

Project Duration: 5 Weeks

Project 6

Project Description:

 

Project Cost:

Project Duration:

project 7

Project Description:

This kitchen was part of a room addition and kitchen remodel combination. We opened up the existing breakfast room to access the new home office and a new game room was thru the office.

We installed multi-leveled Bertch Cabinetry to the 9 foot ceiling with Granite Counters, stone back splash and Stainless Appliances. We also install a Laminate floor to match the rest of the home

Project Cost: $71,000.00

Project Duration: 6 Weeks