Custom Remodels

Do you have a home renovation or kitchen/bath remodeling project you'd like to start? Houston general contractors Everhart Construction can turn your ideas into reality.

Project 1

Project Description:

In this home we remodeled the living room, dining room and front entry. We started by removing the raised dining room floor and railings to give it a more open feel. We also floated out the brick fireplace and removed the hearth for more floor area. We then added over sized base board, crown mold, picture frame mold and window casing. We install a floating laminate floor and re painted everything

Project Cost: $25,000.00

Project Duration: 4 Weeks

Project 2

Project Description:

This home was hit by Ike and also flooded with about 8" of water. The entire home was gutted down to the studs and all electrical including the panel had to be replaced due to code issues. We went back with all new insulation, sheet rock, doors and trim, 2 new bathrooms complete with granite counter tops, all new kitchen, All new screeded hardwood floors and a complete new roof.

Project Cost: $115,000.00

Project Duration: 60 days

Project 3

Project Description:

This home was flooded with 6" of water. We replace everything from 4 feet down in the entire house, floors sheet rock, doors, trim, complete paint, 2 new bathrooms and all new lower cabinets with granite counter tops and tile back splash.

Project Cost: $75,000.00

Project Duration: 6 Weeks

Project 4

Project Description:

This was a real quick little upgrade from painted wood stair spindles to black Iron stair spindles and stained hand rail.

Project Cost: $3,200.00

Project Duration: 3 Days

Project 5

Project Description:

This home owner wanted a new hobby so we removed an existing wet bar area and built a new 200 gallon salt water fish tank. We also built a new 42" high breakfast counter. We supplied all pumps, tank, skimmer and all equipment needed for the project. An interesting note; the tank weighs about 3000 lbs and is sitting on what appear to be regular job built cabinets.

Project Cost: $16,500.00

Project Duration: 2 Weeks

Project 6

Project Description:

This home had burned down due to an electrical fire in the garage. Pryor to the fire, the home was 1929 square feet. We re-designed the home to make it a little larger for the homeowner and after the re-design, the home stood at 2805 square feet. We added a large front porch, a covered back patio, a six foot extension to the breakfast room, a new downstairs laundry / mud room to the back of the home, one additional bedroom and an upstairs game room. We also upgraded just about everything in the home.

Project Cost: $225,000.00

Project Duration: 90 Days

Designed By: L. Mash. & C.C. Everitt

Project 7

Project Description:

This home was flooded and took in about 12" of water. We completely gutted the kitchen and 2 bathrooms and 4 feet up throughout the entire home. We replace all screeded hardwood floors, carpet and tile, doors and trim. We installed custom cabinetry int the kitchen and bathrooms along with granite counter tops.

Project Cost: $125,000.00

Project Duration: 8 Weeks

Project 8

Project Description:

This homeowner enjoyed playing darts inside their home and as they did not have a game room, they wanted to be able to hide the dart board when not in use, they wanted the cabinet to look more like a piece of furniture than a dart board cabinet.

Project Cost: $1800.00

Project Duration: 1 Week