Project 1

Project Description:

This bathroom was completely gutted down to the studs. We were able to enlarge the shower by using an adjacent hallway closet. We moved all electrical and plumbing as needed for new bathroom layout. We installed custom cabinetry, granite counter, seat and shelves, 3/8" frameless shower door system, dual wall mount shower heads and one ceiling mount shower head. We also installed all Porcelain floor and wall tile.

Project Cost: $19,500.00

Project Duration: 4 weeks

Project 2

Project Description:

For this master bath remodel, we gutted the bathroom and closets down to the studs. We relocated the plumbing and electrical for the new layout. We turned one of the corner closets into a walk in shower which was large enough that we were able to have a walk thru opening with no shower door. In the shower we installed one wall mount shower head, one ceiling mount shower head and six body sprays. We all install custom cabinetry, granite counter tops and granite shower curb and trim. We install slate at the shower walls and tub surround and porcelain tile at the bathroom floor.

Project Cost: $36,000.00

Project Duration: 6 weeks

Project 3

Project Description:

This was a simple hall bath remodel in which we kept the existing tub, vanity cabinet and commode. We enlarged the existing shower considerably, install new shower valve and drain lines. We install new granite counter top, new shower door unit, new sink and faucet. We install all porcelain tile on the bathroom floor, tub and shower walls. we also removed the wall paper and textured and painted the walls.

Cost of project: $12,000.00

Length of project: 3 weeks

Project 4

Project Description:

This was a simple hall bath remodel in which we installed a new tub with new shower valve. A new vanity cabinet with granite top and under mount sinks. New porcelain tile floor and shower walls and paint and texture.

Project Cost: $9,000.00

Project Duration: 3 weeks

Project 5

Project Description:

This master bath remodel was done to make the shower area Handi Cap accessible. We removed the tub completely and built a much larger shower that was wheel chair friendly which included a roll in shower curb. We also relocated the commode to make it much more accessible for the owners We also installed new custom built cabinetry with granite counter tops. we installed porcelain tile on the bathroom floor and shower walls.

Project Cost: $21,000.00

Project Duration: 5 weeks

Project 6

Project Description:

Project Cost: $13,000.00

Project Duration: 3 weeks

Project 7

Project Description:

This project was a complete master bath, mater closet and master bedroom remodel. We completly relocated the master closets closer to the master bath and by moving the closets, we were able to add a french door and windows overlooking the patio and back yard. We also had to remove the existing concrete slab that th original bathroom sat on and pour a new foundation. we relocate all the drain lines, re-plumbed the entire home and added 2 tankless water heaters. This project had many custom cabinets, vanity and built-ins. Everything in this project was special order and top of the line.

Project Cost: $96,000.00

Project Duration: 120 Days

Project 8

Project Description:

This was a complete master bath remodel. The homeowners main objective was to have a very large whirl pool tub for therapeutic reasons installed in their bathroom. We reversed the location of the original tub and shower in order to best fit the new over sized tub. We also had to move the closet door in order for the new tub to fit the wall space. We also installed new cabinets with granite counter tops and new porcelain floor.

Project Cost: $28,000.00

Project Duration: 4 Weeks

Project 9

Project Description:

This homeowner had a 1950's hall bath and it was time for an update. They wanted to stay very retro in style but wanted the functionality of an updated bath. We install a new tub with new valve, a new commode, new granite counter tops, a new mosaic tile floor and all new paint .

Project Cost: $ 7,800.00

Project Duration: 2 Weeks

Project 10

Project Description:

In this remodel we changed the existing 3 x 3 shower, tub surround, tile floor & vanity cabinets for $ 16,500.00. This include paint, sheet-rock repairs & a few other items. By rotating the existing tub we were able to gain two extra feet for the shower, and this custom all-in-one tub deck with shower bench.

Project Cost: $16,500.00

Project Duration: 3 1/2 weeks

Project 11

Project Description:

This was a very typical 1950's Hall Bath that desperately needed an update. We install Bertch Cabinetry, Granite Conters and a whole bunch of tile.

Project Cost: $19,500.00

Project Duration: 4 weeks